Community Development · Suka Jadi, Dolok Tolong, Dairi, Sumatera Utara

Clean Water Flowing to Suka Jadi, Dolok Tolong

Fifteen families in the hamlet of Suka Jadi, Dairi, still have no safe drinking water. They are ready to dig the trench and pay for their own home connection materials. Help us build the tank and pipeline that will bring the water to them.

Rp 8.150.441

raised of Rp 81.738.140

9% funded · 1 donor

Support this project
people served
±70
households served
15

Since 18 June 2025, 230 households in Dolok Tolong Village, Sumbul District, Dairi Regency, North Sumatra, have had safe drinking water through a piped system run by their own Village Water Committee.

But 15 households in the hamlet of Suka Jadi, which is officially part of Dolok Tolong, are not connected yet. The hamlet is about 1,000 metres from the main pipeline, so people there still rely on water sources that are neither reliably safe nor always available. That is a real health risk for those families, especially the children.

What will be built

  • One reinforced-concrete storage tank with a capacity of 15,000 litres, complete with inlet and outlet pipes and a float valve.
  • About 1,000 metres of HDPE distribution pipeline from the main line to Suka Jadi, including a pressure-reducing valve.
  • A household connection for each of the 15 families.

When it is done

Around 60 to 75 people will have clean water at home. The time and effort that now go into fetching water from far away can go to other things, and the risk of waterborne disease drops. Suka Jadi will join the fee and maintenance fund arrangement already in place, so the Dolok Tolong Village Water Committee can keep looking after the system.

Community self-help

Residents put in their own work and money

Residents are digging the 1 km trench together and paying IDR 750,000 per household for their home connection materials.

Value of the community contribution: Rp 11.250.000

Budget summary

Costs broken down by component. The labour and money residents contribute are not included here.

  • Distribution pipeline, 1,000 mRp 15.390.400 (19%)
  • Concrete storage tank, 15,000 LRp 42.717.000 (52%)
  • Technical labour & supportRp 16.200.000 (20%)
  • Contingency (10%)Rp 7.430.740 (9%)

TotalRp 81.738.140

Project stages

  1. Preparation & community outreach

    Not started

  2. Tank construction

    Not started

  3. Pipeline installation

    Not started

  4. Household connections

    Not started

  5. Testing & handover to the Village Water Committee

    Not started

Support this project

Your gift is recorded for this project only, and we'll email you the transfer details.

  1. Amount
  2. Program
  3. Your details

Step 1 of 3

Amount

How often?
Choose an amount
Rp

Minimum Rp 10.000

Donate